- Client: I&P Tomorrow GmbH
- Year: 2021
- Producers: Ingrid Puschautz-Meidl & Peter Altmann
- Creative Director: Peter Altmann
- Musical Director: Herbert Pichler
- Production Designer: Manfred Nikitser
- Costume Designer: Niko Niko
This open-air event featured ten stars of the German and Austrian musical scene, who performed 30 songs during a two-and-half hour-long concert. The soloists were musically supported by a live band and a 100-person choir on stage.
The idea was to incorporate the special venue – a stone pit – into the production design. A round arch stage with a transparent roof fit perfectly into the natural surroundings without covering too much. The additional LED screen behind the band was used as a digital backdrop, providing the stage with more depth and a visual highlight.